Skip to content
Moosachstraße 82/85

Munich · 2019

Moosachstraße 82/85

Interior spaces at a property in Munich, shown during construction.

WORK COMPLETED

Our work on this project.

At Moosachstraße, we worked on wall and ceiling systems, insulation and service linings. Acoustic and fire-protection systems were also part of our scope in 2019.

The retained photographs show partition installation, with framing and boards at different stages of enclosure before final finishing.

  • Partition walls and drywall construction
  • Suspended ceilings
  • Fire-protection systems
  • Acoustic systems
  • Insulation works
  • Service linings