
Munich · 2021
KUPA Pasing
A residential quarter with five new buildings and 167 apartments around the historic Kuvertfabrik in Pasing.
WORK COMPLETED
Our work on this project.
We carried out wall systems and linings, fire-protection details, shaft and wall linings, ceilings and insulation in several parts of the development.
The gallery presents the individual work areas and stages of dry construction.
- Partition walls
- Wall linings
- F90 fire-rated walls
- Shaft linings
- Wall linings
- Suspended ceilings
- Insulation work
